Energy and Buildings 59 (2013) 1120–Contents lists available at h eSciVers h h tScienceDirec能源 和 建筑j ourna l ho me p age: d h dPerformance analysis of the air-conditioning syste
MAJOR HAZARDS ANALYSIS- AN IMPROVED PROCESS HAZARD ANALYSIS METHODby Paul BaybuttPrimatech Inc. 50 Northwoods Blvd. Columbus OH A version of this paper appeared in Process Safety Progress Vol. 22
英文原文 ofmunication Signals and SystemsSignals can be categorized in a number of different ways such as random versus deterministic discrete time versus continuous time discrete amplitude versus
#
第二单元第三单元第四单元第五单元
Abstract Characterization of the asphalt mixture microstructure using two dimensional (. 2-D) imaging techniques could be an economically efficient approach. However the features that have beencapt
The text of free-form architecture: qualitative study of the discourse of four architects Joseph F. Wong Division of Building Science and Technology The City University of Hong Kong Tat Chee Avenue Ko
翻译文献:(对组合机床滑台动态性能的调查报告)文献:Peter Dransfield出处: Peter Dransfield Hydraulic Control System-Design and Analysis of TheirDynamics Springer-Verlag 1981中文译文: 对组合机床滑台动态性能的调查报告【摘要】这一张纸处理调查利用有束缚力的曲线图和状态
FINITE-ELEM
英文缩略语 英文原文 中文译文 A·A· ALWAYS AFLOAT 永远漂浮 ABT ABOUT 大约关于 A/C ACCOUNT 计算 A/C ACCOUNT CURRENT 账户 ACCT ACCOUNT 账目账户 A·C·P· ANCHORSCHAINS 锚和锚链试验台 ACPT ACCEPTANCE 接受 A ADDRESSMISSION 订舱佣金租船佣
违法有害信息,请在下方选择原因提交举报