Under internal pressure steel pipe and nonferrous metal pipe test pressure shall be times of design pressure vacuum pipe test pressure shall be 0200000 mpa. 2. The test should be equipped with pressu
#
#
#
Change V
#
DRAFTAustralasian
#
Preparations for a key pressure test of the blown-out Gulf of Mexico oil well are under way BP has test expected to yield information on how to seal the well permanently is set to begin late on Wedne
PIPE16名称PIPE16?–?弹性直管产物: MP ME ST PR PP ED{0>Element Description <}0{>构件描述<0}{0>PIPE16 is a uniaxial element with tensionpression torsion and bending capabilities. <}0{>pipe16是一单轴的元件具有拉压扭转和弯曲性
违法有害信息,请在下方选择原因提交举报