CALT
#
Project Management Report forTiger TradingIntroduction to Project ManagementBSA 301Assignment 2Prepared By: Li XinUtas ID: 065408Due Date: May 25th 2007Created with an evaluation copy of Aspose.Wor
#
Click to edit Master title styleClick to edit Master text stylesSecond levelThird levelFourth levelFifth levelProject Management Professional (PMP)Certification Study GuidePMI Certification MaterialsT
#
#
The WBS is aplete list of all of the activities that make up the WBS starts with the Deliverables from the Scope. This will make level 1 of the WBS (typically 5 -15) We call level 1 the Blocks of
#
Enterprise Project M
违法有害信息,请在下方选择原因提交举报