The front of the embedded anchor foundation pit the cable wind rope force direction pit deep within the range of times should not have cooking cables underground pipelines etc. (3) embedment anchor i
The location of the embedded anchor bolts elevation and the length of the above base. The center line of the embedded anchor bolts position deviation in the equipment cannot be properly installed Elev
The use of it 一It用作代词1 表达以下概念:指代前文提到的事物 替代前文中的内容指代一位性别不明的小孩或未知的人 指代时间天气气候距离等自然现象……的区别:考题:1.I have been admitted into a key university ___Ive been dreaming of for years A that B what
#
EPJ manuscript No
the skirt floor of central circle diameter of the anchor bolt hole deviation two adjacent hole chord length allowed deviation and chord length to allow any two hole deviation allowed is 2 mm. (3) the
The Evoluti
Front of the class台词 get that look a lot but I never let it get .......Some of them yelped and coughed . Is this what I look like to other people one was even trying to be adults were out of work .T
the equipment foundation position and size of the main inspection items: 1) the basic coordinates 2) different plane of elevation 3) planar dimension 4) on the convex planar dimension 5) recess size 6
#
违法有害信息,请在下方选择原因提交举报